Avis

Portion of Point Deroche Road closed during construction

Date de publication: Juillet 18, 2025
Partager cette page
Le contenu suivant est seulement disponible en anglais.

A portion of Point Deroche Road in Blooming Point is closed for construction between July 21 and August 1, weather permitting.

The road closure is about 1 km between the MacDonald Road and the Afton Road.

Dates: 
Construction is expected to start on Monday, July 21 and finish in early August.

Traffic: 
Motorists must choose alternate routes, as the road will be closed.

Safety:

  • Traffic should reduce speed and be prepared to stop.
  • Plan ahead to reach your destination on time.
  • Reduce speed in the area.

Stay in the loop and plan your route during road construction:

 

Media contact:
Dan Hodgson
Department of Transportation and Infrastructure
danmhodgson@gov.pe.ca

Date de dernière mise à jour:
Renseignements généraux

Ministère des Transports et de l’Infrastructure

Immeuble Jones, 3e étage

11, rue Kent

C.P. 2000

Charlottetown (Î.-P.-É.) C1A 7N8

Téléphone : 902-368-5100

Télécopieur : 902-368-5395

Accès Î.-P.-É. / Bureau central de la sécurité routière

33, promenade Riverside

Charlottetown (Î.-P.-É.)

Téléphone : 902-368-5200

accesspeicharlottetown@gov.pe.ca

Questions relatives à l’état des routes : roads@gov.pe.ca

Signaler des problèmes liés aux transports