Avis
Asphalt widening and resurfacing for Mayfield
Le contenu suivant est seulement disponible en anglais.
Asphalt widening and resurfacing on Route 13 in Mayfield will provide a smoother surface for vehicles and widen the roads with paved shoulders.
Work at Route 13 Mayfield will start approximately 570 metres north of Toronto Road and Route 13 and proceeds north for 1,500 metres.
Dates:
Wednesday, September 3, with completion expected by Friday, September 5.
Traffic:
Two-way, stop-and-go traffic will be in effect.
Safety:
- Traffic should reduce speed and be prepared to stop.
- Plan ahead to reach your destination on time.
- Reduce speed in the area.
- Obey flaggers and signs.
- Remember, speeding and using your phone while driving, even when you’re waiting in traffic, are against the law.
Stay in the loop and plan your route during road construction:
- PrinceEdwardIsland.ca/PlanYourRoute
- Road construction map Prince Edward Island 511
- Follow PEIPublicSafety on Facebook
Media contact:
Dan Hodgson
Department of Transportation and Infrastructure
danmhodgson@gov.pe.ca
Date de dernière mise à jour: